Wastewater treatment in Švenčionys
Completed in 2024, the Švenčionys wastewater treatment plant meets the strictest environmental requirements. The modernisation included the installation of a pre-treatment complex system and an automated reception system for incoming wastewater. The Feko+ incoming wastewater reception station and the P2002 sampler installed in this system ensure more efficient wastewater reception, as well as a more comfortable and sustainable life for the entire Švenčionys district community.
2 pcs – Noggerath® Combi TOP/F 45
1 pcs- Feko+ wastewater transfer station
1 pcs- Automatic Stationary Sampler PP2002
We believe that the installed equipment proposed by Fineco Ltd will have a long service life and will work perfectly in fulfilling the objectives set for these plants.
01
Combined Pre-treatment
The Noggerath® Combi TOP/ F 45 with integrated sand washing has been manufactured and installed in this wastewater treatment plant. It is a complete pre-treatment plant combining all the necessary wastewater treatment processes in one system: fine screening, dewatering of the sieved waste, conveying, separating and washing of the sand and removal of grease, oil and lubricants.
02
Reception and sampling of incoming wastewater
The FEKO+ Wastewater Receiving Station is a multifunctional unit for receiving, analysing and accounting for incoming wastewater. It identifies carriers, wastewater suppliers, and measures the parameters (pH, temperature, conductivity, density) and volume of the incoming wastewater.
The P2002 sample scoop ensures representative sampling according to ISO 5667, taking into account time, flow, event or mixed sampling programme.